Answer / vipin kumar saini
Quantity of concrete in this slab= 0.1cum (and now quantity of sand =0 .0217cum(32 kg) and quantity of sand =0.0434cum and gravel quantity= 0.0868 cum)
Is This Answer Correct ? | 1 Yes | 0 No |
minor loss due to sudden contraction 1>flow contraction 2>Expanssion of flow after sudden contraction 3>cavitation 4>boundry friction
what is mean by Face bar using in coloums?
how much quantity of tile placing can be finished by one mason per day?
Is it possible to make a feature using an overdefined sketch?
Formula for calculating the volume of bulb in underreamed pile
how to calculate the chair reinforcement length in slabs, footing or anywhere??
how to calculate concrete pouring of foundation
For a three storey residential house,tmt steel of what grade is good fe415d or fe500d
how to calculate testing date
Briks type
what is ment by surveying?
how much quantity of work we can get by rod benders per day