What would be the quantity of cement:Sand:Aggregate (1:2:4)
requirement for slab casting measuring 1mtr x 1mtr x 0.10
mtr (4 inches)?
Answer / vipin kumar saini
Quantity of concrete in this slab= 0.1cum (and now quantity of sand =0 .0217cum(32 kg) and quantity of sand =0.0434cum and gravel quantity= 0.0868 cum)
| Is This Answer Correct ? | 1 Yes | 0 No |
extra how much quantity need to fill the actual excavated quantity.
What is the Specific gravity of cement?Water?
What kind of foundations used in block cotton soils
how to find out compressive strength of concrete
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
what is flashing?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
Write short note on construction programme for pile foundation.
what is mean by hysd bar?
HOW CAN DESIGN LENGTH,WIDTH AND HEIGHT THE FOUNDATION FOR THREE FLOOR BUILDING?
How to calculate the force on a column of three story building. What should be the base concrete height?.
What is 1/8 on the architect ruler denotes?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)