Any body tell me how can we calculate 1m3 quantity of cement
sand aggregrate in kg.
Answers were Sorted based on User's Feedback
Answer / selvanathan
in 1:2:4 concrete:
Take try volume : 54%
So, add try volume for 1 cum - concrete = 1.54
Cement volume:
1.54/(1+2+4)= 0.22 cum.
convert to kg. 0.22x1440=316.80 kg
Convert to bags = 316.8 / 50= 6.4 bags
Sand Volume:
0.22x 2 =0.44 cum. (2 is ration of sand)
Aggregate volume:
0.22x 4 =0.88 cum. (4 is ratio of aggregate.)
Is This Answer Correct ? | 18 Yes | 0 No |
Answer / krishna kumar.a
Example : concrete 1:2:4
Coarse aggregate =95% of volume =0.95 cum.
Fine aggregate = 50 % of coarse aggregate =0.475 cum.
Cement = 50 % of Fine aggregate =0.2375 cum.
=0.2375 * 1440 kg./ cum
=342 kg.
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / fahimabid
1) ADD 25% DRY VOLUME
2)SUPPOSE ITS 1:1.5:3 (M20) CONCRETE
3) CEMENT=(1.25/1+1.5+3)=.227 Bag
4)CALCULATE SAND & AGGREGATES BY RATIO
Is This Answer Correct ? | 4 Yes | 8 No |
why we need pcc?
what is the yield strength of M30 grade of concrete
What is meant by cad?
first wt is reqd. for making a mix design of concrete & the procedure of determining the qty. of material used in concrete.
material requred for 1 square foot lanter with formula
WHAT IS PMB IN CASE OF ROAD PAVEMENT? WHY PMB IS PREFERED THAN ORDINARY BITUMINIOUS SURFACING?
What is the difference between first angle projection and third angle projection?
9 Answers CLG, Elecon, JTEKT, Nagarjuna Construction,
What are the Types Of DPC and its Thickness used?
How much quantity a carpenter can do in a day
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.