for columns reinforcement the lap length is not provided then
how to rebar the rods then how rebar should be lapped
Answer Posted / n.rajesh guttedar
1) In the columns portion chip the old concrete in a small
depth at least we get the tie beam rods.Then make L bend of a
columns rods and weld it.
2) In the columns portion drill a holes to insert the new rods
and pour the bonding chemical ( Bonding agent )
3) In the columns portion fix the MS plate with the required
holes for the holefasners insert.And make the columns in U
type shape and weld it.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
what is the mode of method of face bar measurement
How to find CN by using arcgis 9.3?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
how we can find sieve #4 is 4.75mm?
What are the types of slump?
What is factor not to be taken in consideration in mix design?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
What are the Types Of DPC and its Thickness used?
How to arrive dry volume of concrete (1.52 to 1.57) ?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
Which is the direction for positive angle?
What is Refuse Area In High Rise Building ?
In earth work 1300 cum soil how to calculate how many liters require in water