for columns reinforcement the lap length is not provided then
how to rebar the rods then how rebar should be lapped
Answer Posted / n.rajesh guttedar
1) In the columns portion chip the old concrete in a small
depth at least we get the tie beam rods.Then make L bend of a
columns rods and weld it.
2) In the columns portion drill a holes to insert the new rods
and pour the bonding chemical ( Bonding agent )
3) In the columns portion fix the MS plate with the required
holes for the holefasners insert.And make the columns in U
type shape and weld it.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
HOw much % of premium on DSR-2013 currently
what is that one cub metre plaster in cemant and fine sand
Define What does civil status mean?
what is the water cement ratio for plastering
What is Joule Brayton Cycle?
How do you maintain water pressure?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
what is thumb rule for calculating the size of ISMB required for a particular length of span
at which depth the construction of tunnel is economical from cost and engineering aspect.
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
Formula of area of crane hook
what are the duties of Site Engineer in work site?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
how to nfind out the specific gravity of sand.aggregate,water please help...