why bent up bars in slab provided in alternate manner and not continuos ?
Answer Posted / tatyasaheb gaikwad
Bending moment towards one and two direction its share
loads.this proses one way slab and two way slabs method.this
bent up length l/7.
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
What is the basic difference between OPC
Dear Sir What is the Contraction joint for base Slab
Material calculation of cm 1:6 for 1sqm
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
what do you understand by M25 concrete
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
Different sizes of Hollow blocks and its weight. Thanks.
what motivates you to do a good job
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
what is the difference between natural draught cooling tower and induced draught cooling tower
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Exterior Joints,define