how many cubic centimeter in one unit of sand?
Answers were Sorted based on User's Feedback
Answer / rama subramanian
1 Unit = 100 cft
1 Unit = 100 Cft/(3.28084*3.28084*3.28084) =2.832Cu.m (Note :1ft =
1 unit = 100 Cft *(30.48*30.48*30.48) = 2831635Cu.cm
Note :1 ft = 30.48Cm & 0.3048m
| Is This Answer Correct ? | 0 Yes | 0 No |
How much block, cement,sand,is required for 1 sqmt of 200*200*400 block work
How much is the cover for slab?
In colomn reinforcement when dia of bar is going to change, than what should be the lap length of bars weather it should be of heigher dia bar lap length or it should the accordance with new dia bar. the grade of concrete is same.
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
how sir calculate the slab steel and sir i want to know that how i calculate shutter works payments in cum and the rate is 120 per cum
what is grade slabs
how can i calculate pcc and rcc cu.mtr rate? specify labor and material cost should be diff
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
For 25mm thick plastering how much sand and cement is used for 1 sft
1 Answers Assurance, Design Consortium,
How much cost will come for 900 sq ft cement plastering
what is FPS brick
how much quantity of cement bags are required to fill the one m3 of empty container.?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)