It's depend on consumption of steel per square feet area
generally, Rs 3.2/kg Consumed steel 3Kg/Sft.
Rs 2.7/kg " " " 4Kg/Sft.

Is This Answer Correct ?    17 Yes 3 No

What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??..

Answer / shah harsh

It will be min 3.5 to 7 rs per kg last

Is This Answer Correct ?    10 Yes 1 No

What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??..

Answer / manishyahoo

Labour rate is Rs.12/- per kg

Is This Answer Correct ?    8 Yes 20 No

Post New Answer

More Civil Engineering Interview Questions

1 what is the nature of your job? 2 what major product or service does your company offer? 3 hoiw does the knoledge of chemistry hels in your job?

2 Answers  


I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?

0 Answers   University of Birmingham,


what affect on the structure and related beam of slab when provide one way slab insteade of two way slab

2 Answers  


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

2 Answers  


what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain

0 Answers   KSP Infra,






HOW WE WILL CALCULATE QTY. OF CEMENT,SAND & AGGREGATE (10MM&20MM) IN Kg.

4 Answers   Nagarjuna Construction,


in which code refer the change of reinforcement dia defer to drawing . i.e. 12mm dai into 16mm dia.

3 Answers  


What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

0 Answers   MTC,


Difference between the setting time and hardenin time of concrete

5 Answers  


IF X = Cement ,Fine Aggregate & Coarse Aggregate are in taken in weights for batching. Y= Cement , Fine Aggregate & Coarse Aggregate are taken in volume for batching. Then what will be the relation between X and Y?

2 Answers  


what is perfect ballast for supporting the rails

1 Answers  


how to find out the quantity of cement sand and aggregate in slab and flooring

1 Answers   L&T, Ramky,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)