How many % we consider for lap for reinforcement for estimates
No Answer is Posted For this Question
Be the First to Post Answer
how to distinguish TMT n Tor steel?
10. Do you remain in good relationship with your previous employer / company where you no longer work /?
HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER.
how many tonnes equals to one cubic feet?
Strength of brick?
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
What is the cement content for 1m3 of M20,M25 concrete?
6 Answers Aishwarya Group, Omaxe, TI Construction,
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
What is the difference between absorption & adsorption and sorption?
What is Pavement & carrage way?
How many material do I need to finish a 340sqms using 190 block size and 700mm x 450mm x 200 mm concrete including of outside and inside plastering
Test procedure of fly ash bricks as per code ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)