why provide water stopper in costruction joits
water stopper is generally 250 to 300 mm parallel to the
retainging wall. half portion inserted in to the concrete
and half portion cast 2nd time concreting work so when
water is penetrating through the joint it is retain by
water stopper.
Is This Answer Correct ? | 5 Yes | 0 No |
what is project planning
sir how can we find the cement and sand required for making 4" drop
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
How did street originate in the plumbing term street ell?
tensile strength of shuttering ply wood=?
what is poissons ration of steel?
what is the density of fine sand grade-2
How much cement ,steel bar, concrete ,required for 416 cum rcc slab
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
draw the sfd and bmd of catilever beam subjected to point load and udl. plot graphically the difference in deflection pattern of simply supported and cantilever beam subjected to point load.
i want measure water capacity in 25'diameter and 7'height of water in circular storage tank in liters how?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?