why provide water stopper in costruction joits
water stopper is generally 250 to 300 mm parallel to the
retainging wall. half portion inserted in to the concrete
and half portion cast 2nd time concreting work so when
water is penetrating through the joint it is retain by
water stopper.
| Is This Answer Correct ? | 5 Yes | 0 No |
What do you mean by the word 'shear'?
What is the difference between routing maintenance and major maintenance in school facilities?
What will be weight of 0.5mm GI sheet per sq.ft?
how inovative you are?...how do u define innovation?
what is the diffrence between grade beam and plinth beam
Number of cement bags required for concreting 1000 square Feet slab of 4 inch thickness.
How many fly ash bricks can occupy in one cubic metre ??
How do you calculate load bearing capacity of a waffle slab?
How is make concrete cube?
any book or article on pumped concrete.
List out some of the checking’s, done at the completion of construction?
How to calculate Brick for 9"wall for100sqft
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)