What is labour rate per kg for cutting,fixing and binding
of reinforcement steet..??
Answer Posted / manishyahoo
Labour rate is Rs.12/- per kg
| Is This Answer Correct ? | 9 Yes | 21 No |
Post New Answer View All Answers
what is shuttering co efficient?
what is pile and deam foundation
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
can i get civil engineering test papers.......?????
How to calculate 1 brss for RCC work
how to calculate the length diamond shaped striupps in column
what is the formula to find the diagonal shape stirrups?
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
What are the basic use of runners and standards of pipelines?
1m square 20mm plastering how much of water need curing work
What expenses counted in contingencies and how much it is in related to built-up area of the building.
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
What are the skills required to become an architect?