08. 4 main points about check list for Shuttering works
are––– 4
i)
ii)
iii)
iv)
09. 4 main points about check list for Concreting works
are––– 4
i)
ii)
iii)
iv)
10. 4 main points about check list for Plaster works
are––– 4
i)
ii)
iii)
iv)
11. 4 main points about check list for Brick works are––
– 4
i)
ii)
iii)
iv)
12. 3 main points about Project delaying factors are–––
3
i)
ii)
iii)
13. Write down 60-grade M.S. deformed bar
specification. 3
14. 3000 psi concrete means:
1
15. 4 main points about methods of wastage control are––
– 4
i)
ii)
iii)
iv)
16. 1 main point about reasons for your honesty is :
1
17. Water cement mixing in hopper less mixture machine
is better than hopper mixture machine because: 1
18. 2 main points about your role during roof casting
are–––– 2
i)
ii)
19. a. The weight of 3333m deform bar of 24.5 mm dia
is…… 1
b. The weight of 300 rft plain bar of dia 1
is……. 1
20. The types of slumps are–––
3
i)
ii)
iii)
21. 4 main points about the causes of cylinder failure
are––– 2
i)
ii)
iii)
iv)
22. Detection of a beam & a girder are––––
2
i)
ii)
23. Curing is needed for––––
1
24. The types of slabs in respect of size & shape are–––
5
In respect of size: i)
ii)
In respect of Shape i)
ii)
iii)
25. The types of Column in respect of size & shape are––
– 9
In respect of size: i)
ii)
In respect of Shape: i)
ii)
iii)
iv)
v)
vi)
vii)
26. 3 field tests & 3 Laboratory tests of bricks are–––
6
Field tests: i)
ii)
iii)
Lab test: i)
ii)
iii)
27. 2 field tests & 1 Laboratory tests of sand are–––
3
Field tests: i)
ii)
Lab test: i)
28. 1 field tests & 1 Laboratory tests of M.S rod are–––
2
Field tests: i)
Lab test: i)
29. a. The % of water absorbs by brick chips: ……………
1
b. The % of water absorbs by Stone chips: ……………
1
30. In respect of design:
5
a. The % of strength gains by concrete in 28 days=
b. The % of strength gains by concrete in 14 days=
c. The % of strength gains by concrete in 07 days=
d. The % of strength gains by concrete in 03 days=
e. The % of strength gains by concrete in 28 days
without curing =
Answers were Sorted based on User's Feedback
Answer / guest
1. four main p;oints of checking list of shuttering
i. verticality
ii. support
iii.centerline of shutter
iv. cover from shuttering to main reinforcement
2.main points of checklist for concrete work
i. pouring
ii. vibrating
iii. slump
iv. water content
3. main points of plaster
i. mixing material
2. checking th. of plater
3. checking equalness
4. fine sand
4.for brickwork
i. testing brick strength
ii. fixing english bond method
iii. verticality
iv. as per drg.
5. project delaying factor
i. avialabe resource manpower
ii. resource of material
iii.project monitoring
6. 60 grade deformed bar specification
i. tensile strength-410/530 n/mm2
ii. yeild stress-265n/mm2
7.psi means
pound per square inch.
8. wastage control
i. preparing check list
ii. utilisation of cut pieace
iii. proper storing
9. honesty means saving your cost
10.less due to non wastage of water
11.role in roof casting
1. checking rod as per drg.
ii. proper vibratior of concrete
iii. mantain slope
iv checking shuttering and support
12.please calculate the length x unit weight of 24.5mm dia
bar
b. not understanding the question
13.types of slump
1. true, 2. collapse 3. zero. 4. shear
14.
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / shuvo.
Q.1 main point about reasons for your honesty is :
Ans. The faer of Creator.
Q.2 main points about your role during roof casting
are-i.Compacting of concrete by vibrator, ii. Slab Casting
level checking.
Q.Write down 60-grade M.S. deformed bar
specification.
Ans. Yeild strength- 60 KSI, Ultimate Strength- 90 KSI,
Elongation- 14%.
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / moin khan
1.Layout cutout size &level
(as per drw.)
2.Soupport fixing
3. Oiling shuttering board
4.ghoogu in beam higher dept
| Is This Answer Correct ? | 0 Yes | 1 No |
Characteristics of a model project are ––
How to decide the thickness of reinforcement concrete roof slab? what"s the thickness in inches the roof of 10'x10'? pls give me the answer and give the formula how to calculate it?
What is the rate of earthwork excavation?
What are the ingredients of pre-stressed concrete?
what is mix design in mortar mix?
Give me an example of a time when something you tried to accomplish and failed.
What is the unit weight of cement?
For a RCC section with congested reinforcement , what is the compaction factor
3 Answers Arihant, GMR, Gulf International Contracting, NBCC,
what is the difference between weir and a barrage
12 Answers AAI Airports Authority Of India, CIT, TCI Constructions,
Pls. help. If a contract was awarded to a contractor in april 2012 with steel & cement base price as rs. 45/kg & 250/bag. Now in oct. 12 steel cement price becomes 55/kg & 290/ bag. How escalation will be calculated? Pls. tell complete calculation Regards,
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
what is mean by hysd bar?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)