08. 4 main points about check list for Shuttering works
are––– 4
i)
ii)
iii)
iv)
09. 4 main points about check list for Concreting works
are––– 4
i)
ii)
iii)
iv)
10. 4 main points about check list for Plaster works
are––– 4
i)
ii)
iii)
iv)
11. 4 main points about check list for Brick works are––
– 4
i)
ii)
iii)
iv)
12. 3 main points about Project delaying factors are–––
3
i)
ii)
iii)
13. Write down 60-grade M.S. deformed bar
specification. 3
14. 3000 psi concrete means:
1
15. 4 main points about methods of wastage control are––
– 4
i)
ii)
iii)
iv)
16. 1 main point about reasons for your honesty is :
1
17. Water cement mixing in hopper less mixture machine
is better than hopper mixture machine because: 1
18. 2 main points about your role during roof casting
are–––– 2
i)
ii)
19. a. The weight of 3333m deform bar of 24.5 mm dia
is…… 1
b. The weight of 300 rft plain bar of dia 1
is……. 1
20. The types of slumps are–––
3
i)
ii)
iii)
21. 4 main points about the causes of cylinder failure
are––– 2
i)
ii)
iii)
iv)
22. Detection of a beam & a girder are––––
2
i)
ii)
23. Curing is needed for––––
1
24. The types of slabs in respect of size & shape are–––
5
In respect of size: i)
ii)
In respect of Shape i)
ii)
iii)
25. The types of Column in respect of size & shape are––
– 9
In respect of size: i)
ii)
In respect of Shape: i)
ii)
iii)
iv)
v)
vi)
vii)
26. 3 field tests & 3 Laboratory tests of bricks are–––
6
Field tests: i)
ii)
iii)
Lab test: i)
ii)
iii)
27. 2 field tests & 1 Laboratory tests of sand are–––
3
Field tests: i)
ii)
Lab test: i)
28. 1 field tests & 1 Laboratory tests of M.S rod are–––
2
Field tests: i)
Lab test: i)
29. a. The % of water absorbs by brick chips: ……………
1
b. The % of water absorbs by Stone chips: ……………
1
30. In respect of design:
5
a. The % of strength gains by concrete in 28 days=
b. The % of strength gains by concrete in 14 days=
c. The % of strength gains by concrete in 07 days=
d. The % of strength gains by concrete in 03 days=
e. The % of strength gains by concrete in 28 days
without curing =
Answers were Sorted based on User's Feedback
Answer / guest
1. four main p;oints of checking list of shuttering
i. verticality
ii. support
iii.centerline of shutter
iv. cover from shuttering to main reinforcement
2.main points of checklist for concrete work
i. pouring
ii. vibrating
iii. slump
iv. water content
3. main points of plaster
i. mixing material
2. checking th. of plater
3. checking equalness
4. fine sand
4.for brickwork
i. testing brick strength
ii. fixing english bond method
iii. verticality
iv. as per drg.
5. project delaying factor
i. avialabe resource manpower
ii. resource of material
iii.project monitoring
6. 60 grade deformed bar specification
i. tensile strength-410/530 n/mm2
ii. yeild stress-265n/mm2
7.psi means
pound per square inch.
8. wastage control
i. preparing check list
ii. utilisation of cut pieace
iii. proper storing
9. honesty means saving your cost
10.less due to non wastage of water
11.role in roof casting
1. checking rod as per drg.
ii. proper vibratior of concrete
iii. mantain slope
iv checking shuttering and support
12.please calculate the length x unit weight of 24.5mm dia
bar
b. not understanding the question
13.types of slump
1. true, 2. collapse 3. zero. 4. shear
14.
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / shuvo.
Q.1 main point about reasons for your honesty is :
Ans. The faer of Creator.
Q.2 main points about your role during roof casting
are-i.Compacting of concrete by vibrator, ii. Slab Casting
level checking.
Q.Write down 60-grade M.S. deformed bar
specification.
Ans. Yeild strength- 60 KSI, Ultimate Strength- 90 KSI,
Elongation- 14%.
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / moin khan
1.Layout cutout size &level
(as per drw.)
2.Soupport fixing
3. Oiling shuttering board
4.ghoogu in beam higher dept
| Is This Answer Correct ? | 0 Yes | 1 No |
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
hi guys what happens if you are absent for a supplymentry exam?
Brick is fire resistant than stone because––
what is mant by point of conter of fracher(p.c.f)
which is greater moment at centre or fixed end moment for a fixed beam with udl
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
Some one plz help me sir ..m gonna start my g 2 rcc building i have a simple design and i want material estimate plz sir help me.someone plz mail to blue print .thnq
how to check the quality of concrete
how many types of foundation
Explain what is zoning permit?
the shearing strength of cohesionless soil depends on
what is density of flyash?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)