08. 4 main points about check list for Shuttering works
are––– 4

i)


ii)


iii)


iv)

09. 4 main points about check list for Concreting works
are––– 4

i)


ii)


iii)


iv)

10. 4 main points about check list for Plaster works
are––– 4

i)


ii)


iii)
iv)
11. 4 main points about check list for Brick works are––
– 4

i)


ii)


iii)


iv)

12. 3 main points about Project delaying factors are–––
3

i)

ii)
iii)


13. Write down 60-grade M.S. deformed bar
specification. 3


14. 3000 psi concrete means:
1

15. 4 main points about methods of wastage control are––
– 4

i)
ii)

iii)
iv)
16. 1 main point about reasons for your honesty is :
1

17. Water cement mixing in hopper less mixture machine
is better than hopper mixture machine because: 1


18. 2 main points about your role during roof casting
are–––– 2
i)
ii)
19. a. The weight of 3333m deform bar of 24.5 mm dia
is…… 1
b. The weight of 300 rft plain bar of dia 1
is……. 1
20. The types of slumps are–––
3
i)
ii)
iii)
21. 4 main points about the causes of cylinder failure
are––– 2
i)
ii)


iii)
iv)

22. Detection of a beam & a girder are––––
2

i)
ii)
23. Curing is needed for––––
1
24. The types of slabs in respect of size & shape are–––
5

In respect of size: i)

ii)

In respect of Shape i)

ii)

iii)
25. The types of Column in respect of size & shape are––
– 9

In respect of size: i)
ii)



In respect of Shape: i)
ii)
iii)
iv)
v)
vi)
vii)
26. 3 field tests & 3 Laboratory tests of bricks are–––
6

Field tests: i)
ii)
iii)

Lab test: i)
ii)
iii)
27. 2 field tests & 1 Laboratory tests of sand are–––
3

Field tests: i)
ii)

Lab test: i)
28. 1 field tests & 1 Laboratory tests of M.S rod are–––
2

Field tests: i)

Lab test: i)
29. a. The % of water absorbs by brick chips: ……………
1

b. The % of water absorbs by Stone chips: ……………
1

30. In respect of design:
5
a. The % of strength gains by concrete in 28 days=

b. The % of strength gains by concrete in 14 days=

c. The % of strength gains by concrete in 07 days=

d. The % of strength gains by concrete in 03 days=

e. The % of strength gains by concrete in 28 days
without curing =

Answers were Sorted based on User's Feedback



08. 4 main points about check list for Shuttering works are––– 4 i) ii) iii)..

Answer / guest

1. four main p;oints of checking list of shuttering

i. verticality
ii. support
iii.centerline of shutter
iv. cover from shuttering to main reinforcement

2.main points of checklist for concrete work
i. pouring
ii. vibrating
iii. slump
iv. water content

3. main points of plaster
i. mixing material
2. checking th. of plater
3. checking equalness
4. fine sand

4.for brickwork
i. testing brick strength
ii. fixing english bond method
iii. verticality
iv. as per drg.

5. project delaying factor
i. avialabe resource manpower
ii. resource of material
iii.project monitoring
6. 60 grade deformed bar specification
i. tensile strength-410/530 n/mm2
ii. yeild stress-265n/mm2
7.psi means
pound per square inch.
8. wastage control
i. preparing check list
ii. utilisation of cut pieace
iii. proper storing

9. honesty means saving your cost

10.less due to non wastage of water

11.role in roof casting
1. checking rod as per drg.
ii. proper vibratior of concrete
iii. mantain slope
iv checking shuttering and support

12.please calculate the length x unit weight of 24.5mm dia
bar
b. not understanding the question

13.types of slump
1. true, 2. collapse 3. zero. 4. shear
14.

Is This Answer Correct ?    12 Yes 0 No

08. 4 main points about check list for Shuttering works are––– 4 i) ii) iii)..

Answer / shuvo.

Q.1 main point about reasons for your honesty is :
Ans. The faer of Creator.
Q.2 main points about your role during roof casting
are-i.Compacting of concrete by vibrator, ii. Slab Casting
level checking.
Q.Write down 60-grade M.S. deformed bar
specification.
Ans. Yeild strength- 60 KSI, Ultimate Strength- 90 KSI,
Elongation- 14%.

Is This Answer Correct ?    2 Yes 1 No

08. 4 main points about check list for Shuttering works are––– 4 i) ii) iii)..

Answer / moin khan

1.Layout cutout size &level
(as per drw.)
2.Soupport fixing
3. Oiling shuttering board
4.ghoogu in beam higher dept

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio

6 Answers   Hitech, MBA, Oasis,


what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

0 Answers  


What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?

3 Answers   Atul, AVR, Pioneer,


what is the proportion of M200 &M300 grade concrete

1 Answers   Karrm Infrastructure,


100sqft of 9" (brickwork).. bricks(standard)=no ? sand= cement=

1 Answers  






What is expansion joint

6 Answers  


How to check Diameter of Np2 rcc pipe?

1 Answers  


How will find compresive strenth of M20,M25,M30 after 7day,8day 28day etc please drive step by step not shot?

2 Answers  


what is the difference between ribbed steel & tor Steel ?

1 Answers  


step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed

0 Answers  


what is the basic fundamental of contouring?

2 Answers  


How to calculate steel for a wall foundation form drwaing

1 Answers   Ircon,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)