Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

08. 4 main points about check list for Shuttering works
are––– 4

i)


ii)


iii)


iv)

09. 4 main points about check list for Concreting works
are––– 4

i)


ii)


iii)


iv)

10. 4 main points about check list for Plaster works
are––– 4

i)


ii)


iii)
iv)
11. 4 main points about check list for Brick works are––
– 4

i)


ii)


iii)


iv)

12. 3 main points about Project delaying factors are–––
3

i)

ii)
iii)


13. Write down 60-grade M.S. deformed bar
specification. 3


14. 3000 psi concrete means:
1

15. 4 main points about methods of wastage control are––
– 4

i)
ii)

iii)
iv)
16. 1 main point about reasons for your honesty is :
1

17. Water cement mixing in hopper less mixture machine
is better than hopper mixture machine because: 1


18. 2 main points about your role during roof casting
are–––– 2
i)
ii)
19. a. The weight of 3333m deform bar of 24.5 mm dia
is…… 1
b. The weight of 300 rft plain bar of dia 1&#61618;
is……. 1
20. The types of slumps are–––
3
i)
ii)
iii)
21. 4 main points about the causes of cylinder failure
are––– 2
i)
ii)


iii)
iv)

22. Detection of a beam & a girder are––––
2

i)
ii)
23. Curing is needed for––––
1
24. The types of slabs in respect of size & shape are–––
5

In respect of size: i)

ii)

In respect of Shape i)

ii)

iii)
25. The types of Column in respect of size & shape are––
– 9

In respect of size: i)
ii)



In respect of Shape: i)
ii)
iii)
iv)
v)
vi)
vii)
26. 3 field tests & 3 Laboratory tests of bricks are–––
6

Field tests: i)
ii)
iii)

Lab test: i)
ii)
iii)
27. 2 field tests & 1 Laboratory tests of sand are–––
3

Field tests: i)
ii)

Lab test: i)
28. 1 field tests & 1 Laboratory tests of M.S rod are–––
2

Field tests: i)

Lab test: i)
29. a. The % of water absorbs by brick chips: ……………
1

b. The % of water absorbs by Stone chips: ……………
1

30. In respect of design:
5
a. The % of strength gains by concrete in 28 days=

b. The % of strength gains by concrete in 14 days=

c. The % of strength gains by concrete in 07 days=

d. The % of strength gains by concrete in 03 days=

e. The % of strength gains by concrete in 28 days
without curing =

Answer Posted / moin khan

1.Layout cutout size &level
(as per drw.)
2.Soupport fixing
3. Oiling shuttering board
4.ghoogu in beam higher dept

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix

1902


Differentiate orthographic and isometric projections?

1226


roll of DLC in road constructions

1876


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

2133


What glue is least sticky?

1217


What are the common ways of demolition?

1264


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1945


Tell me about triple point of water.

1108


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2082


List out the potential risk factors for workers on the construction site?

1074


Why Should Curing Not Be Done By Ponding And Polythene Sheets?

1275


Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

1097


how many BSCs can i connect to the HUAWEI MSC

2302


Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

2401


Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?

2361