why building got air crack? if it get in one particular are
what is means?
No Answer is Posted For this Question
Be the First to Post Answer
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
qty of cement,sand and aggregate (1:3:6) required for RCC Slab size 1000 x 500 x 100 mm
what is c&c++?
what is the purpose of laying PCC?
How to Calculate the amount of Cement mortor required only for 12 or 10 mm bonding? I mean to know only the amount of mortar for bonding not for plastering. Help me to find this.
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
How much 1 cum of M15, M20 & M25 concrete weigh?
What is the technical name for aggregate stored in trepizoidal shape near railway station.
How to calculate cut length of square shape stirrups?
how much minimum steel provide in column
what is the difference between volume and weight batching and which is better?