As a good company employee, can you report your supervisor
to the company management if he or she is going against the
company interest in his or her actions?
Answers were Sorted based on User's Feedback
Answer / arman
first i will communicate politely with my supervisor that his action may not be suitable for the comapany.if he agrees then ok,otherwise i will definitely report to the comapany mngm,bcz i'm not working for supervisor,i'm working for my company.
| Is This Answer Correct ? | 13 Yes | 1 No |
Answer / srinivas cnu
I believe my first step would be to talk to my supervisor. I would need to understand what he/she did and why and then reason with him/her to set things straight.
If this doesn't work out there is still time to talk to my team leader.
| Is This Answer Correct ? | 0 Yes | 0 No |
why battery dc voltage become Half when we check with respect to ground for example 120volts + and - terminals and when we check + terminal with Earth thats 60volts why 60volts we can not ground the battery.
A 100 kVA , 400 v/250 kv testing transformer has 8% leakage reactance and resistance on 100 KVA base . A cable has to be tested at 500 kv using the above transformer as a resonant transformer at 50 hz . if the charging current of the cable at 500 kv is 0.4 A find the series inductance required . Assume 2% resistance for the inductor to be used and the connecting leads . Neglect dielectric loss of hte cable . what will be the input voltage to the transformer ?
WHAT IS DC COMPONENT IN CIRCUIT BREAKER?
how kva rating of transformer is calculated.
6 Answers Fluor Daniel, Siemens,
If i want to build 230kv substation what are the equipments to be installed?
How can we calculate the motor frame sizes?
what is the formula for efficiency of francis turbine and generator for hydropower? what is best way to select francis turbine and generator?
how does WTI work ?
Difference between RCCB, RCBO and ELMCB.
how could we findout the lightning arrester failed or not in live circuit? Is there any instrument to measure the high voltage at the time of sky lighting?
DEAR ALL I have motors ( 10 units )each one is 90kw 380V 50 HZ 1000rpm but new local pwer is 220v 60 hz requierd rpm should be 1000 pleas what the beast solution is used frequncy converter or rewinding all motos or chang all motors thanks
what is H.T?specify the range?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)