Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO
1:2.5:5 WITH 40MM Size aggregates for 1 cumtr.

Answers were Sorted based on User's Feedback



HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO 1:2.5:5 WITH 40MM Size aggregates for..

Answer / mohsin

Using a M15 Grade Ratio is 1:2.5:5 & Quantity Is 1m3

Now Add 1.52% Dry Volume In Total Quantity
So 1*1.52=1.52

1.52/8.5=0.178
0.178/0.03472=5.15 Approximate Cement bags.
Sand=0.178*2.5
=0.44m3
Aggricate=0.178*5
=0.89m3

Cost Of Labour Cost Of Material
--------------- ------------------
Mason- 450rs Cement=220*5.15= 1133 rs
Helper-210*2= 420rs Sand=400*0.44= 198 rs
Bhisti= 180rs Aggricate=620*0.89= 551.8 rs
------------------- --------------------------------
Total rs= 1050 Total Rs = 1882.8 Rs
Now Consider the 10% of total quantity...
And 10% Contractors profits

Is This Answer Correct ?    14 Yes 5 No

HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO 1:2.5:5 WITH 40MM Size aggregates for..

Answer / sivaprakashan

its true

Is This Answer Correct ?    2 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

What are the precautions needs during concrete pouring in very hot weather?

1 Answers  


37.18kg/qu.cm.Compressive Strength and 10.20% Water Absorption weight,Efflorescence-nil  this result use in construction work

1 Answers  


how to calculate rate analysys of 1:6 plastering 10 sq m

0 Answers   DLF,


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

0 Answers  


What is the weight of 10mm,20mm,40mm aggregate per cubic ft in kg?

5 Answers   Akasva Infrastructure Private Limited, L&T, NCC, Virchow,


Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc

0 Answers  


proportions of m10, m15, m20, m25, m30, m40, m45, m50, m60, m70, m75, m80 etc

12 Answers   L&T,


PL.tell me about civil engineering questions with answer

0 Answers   Construction, L&T,


How do you calculate the power of a centrifugal pump?

0 Answers  


curing of concrete why 7day's,14day's 21day's 28days

5 Answers   Gammon,


what is the difference between rise and tread? what is its standered size? what is waist slab?what is the standered length of staire-case? also what is the angle between floor and landing?

5 Answers  


how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)