the volume of cement req for 70cum of brickwork in 1:6
cement mortar is approx is equal to
3cum
5cum
7cum
1ocum
No Answer is Posted For this Question
Be the First to Post Answer
how the sand fail?
what is a pretension and post tension with an example
Q:What is the formula of bar to bent the slab in bent slab? Second question Q: what is formula to calculate the hook?
what is shear force
2 Answers NLC Neyveli Lignite Corporation Limited,
How Much Anailed Wire (Binding Wire) use Per KG in Running Meter ?
how much kg of binding wire is used in slab ?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
in coarse stone masonry(bela masonry),how many cement bags are used in cement mortar for proportion 1:6
Moisture content calculation for diff mix ratio's ??
Why is loose concrete removed from the surface where new concrete is to be done?
1)What is the maximum size of aggregate that can be used for M-50 grade concrete ? Code teh authority?
Define What is the difference between routing maintenance and major maintenance in school facilities?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)