how to do reconciliation of steel
Answer / sjtbehera
go for bar bending schedule, obtain dia wise reinforcement
also trackout what weight are come to site. then it gives
the balance avialiable at site.
this is the reconciliation of steel.
Is This Answer Correct ? | 16 Yes | 11 No |
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
How do you come to know that any highway u r traveling,That is NH or SH?
what is the difference in density of fresh concrete and hardened concrete?
1 Answers GPSC Gujarat Public Service Commission,
what are the challenges of being a team leader and a supervisor?
what is the diffrence of opc and ppc cement ? expailn
what are some possible sources of error in the CBR test?
calculation of cement bags in 1:2:4 concrete mix
what will be hook length of stirrups
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
How calculate the physical stock of material such as Fine/Coarse aggregate,sand & stone dust laying at site?
what is the factor of safety for cement and steel with reference to IS 456-2000. and min reinforcement should be provided for column and slab with reference to IS 456-2000.
What is gravity flow?