1.how to calculate the nails qty in shuttering of column,beam, shear wall.
2.how control the binding wire wastage in building project.
3.
Answer / ratheesh
.750grms to 1Kg nails for 1sqm shuttering.
u can use single binding wires
| Is This Answer Correct ? | 2 Yes | 2 No |
how to calculate 1 cubic meter rcc concrete 1:1.5:3 ratio ,how much aggrates and sand , quanitites
for mortar 1:18 how much cement and sand required for 1 CM
consumption of cement in p.c.c. a. mix. 1:1:2 b. mix. 1:1.5:3 c. mix. 1:2:4 d. mix. 1:3:6 e. mix. 1:4:8
what are the types of footing
Define What is diversion tunnel in a dam?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
Number of cement bags required for concreting 1000 square Feet slab of 4 inch thickness.
time and work questions
how to consider the lap length of a bar in IS code.
cement constant for brick works
which size of box use of cement,sand,aggregate to use the m 20 concrete. i know the quantity of material cement 400 kg or 8 beg ,662 kg sand and 1200 kg aggregate. i can use only 1 beg cement so pls give me answer . thx in advance
How to calculate the sand and aggregate in concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)