Load bearing walls:
It should transfer the load (live load,dead load) from
slab,beam,lintel etc,, to the foundation. This structure
designed for Loading condition.
Non Load bearing wall:
This wall won't take any load. It's just like a partition
between adjacent Space. this wall designed to take its self
weight alone
| Is This Answer Correct ? | 116 Yes | 9 No |
Answer / amit
any wall which touches the top slab , beam and lintel are called as load bearing wall,
non load bearing wall are those walls which we gernerlly keep it for elevation purpose..
| Is This Answer Correct ? | 17 Yes | 4 No |
Answer / jainender
simple load bearing wall have a load and non load bearing
is free standing.
| Is This Answer Correct ? | 12 Yes | 4 No |
Answer / akil ahmed
load bearing wall -it is defened as these wall take the
load of slab and beam.such as main wall those wall are
not take the load of beam and siab are called non bearing
wall
| Is This Answer Correct ? | 13 Yes | 10 No |
Answer / sanehit kaushal
Load bearing wall are the wall which can exist the load and than transfer to the foundation is called load bearing
Non load bearing wall which don't exist load there load is directly go by beam and columns is called non load bearing wall
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / madeva
Load transfer in the wall is called load bearing wall
Load transfer in the beam 2 column is called non bearing wall
| Is This Answer Correct ? | 4 Yes | 11 No |
brickwork labour rate per cum ?
Key is put at the time of casting 1st lift of column to get– –
How can we compact the soil on slope portion? What is the Grade II of Stone Metal?What type tests carried out on BBM road?
koi bta sakta ha ka steel ko calculate krna ka full mathod pls
how to convert cement, sand aggregate quantity from M3 to kg with full description?
What are the responsibilities of a construction manager?
how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl
acceptance criteria for concrete works
Using 1 lit paint how many sq.ft of wall we can paint. Thanks.
time and work questions
lap length formula
how many materirials in 1 m3 concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)