what is the requierd compressive strenth for m 20 grade concreat for
7 days?
Answer Posted / eng. mohd noor salleh
75% of 20kn/m2 is required, i.e= 15kn/m2
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
How to calculate the force on a column of three story building. What should be the base concrete height?.
how many types of survey and what are levelling instrument?
how to preaper for interview wat they asked in interview give me idea
Bernaullis theorem deals with the law of conservation of mass momentum energy none
Moisture content calculation for diff mix ratio's ??
what is difference between GTS bench mark and temporary bench mark
Explain what are the phases inspections are done by local authority while construction?
what is w/c ratio in dry lean concrete for m10 mix design
Is there any course for billing available in Mumbai? If yes then please mail me the details..
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover