what is the requierd compressive strenth for m 20 grade concreat for
7 days?
Answer Posted / shahnawaz
60% on 7 days ,its 12 kn/mm
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
how to calibrate the RM 800
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
if the nitrates more than 45mg/l in water lead to disease then what is it called
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
how much cost of single coat 20mm thick plastering per sqre meter
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What is the difference between linear dimension and aligned dimension?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
may i know the detailed description of cutting length
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
How much cement is require in one sqft area in a G+3 residential construction.
How to calculate paint drums per meter square
can any one explain bar bending schedule of bems and columns and slabs ??