what is the requierd compressive strenth for m 20 grade concreat for
7 days?
Answer Posted / sjtbehera
as per Is code- 456-2000 for M20 concete 7days strength
175kg/sqcm or 17.5 kn/sqmm
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Which brick is best for construction ,either fly ash or AAC BLOCKS
How to do base isolation using ETABS software?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
Define the various stages of the project planning process in construction.
Concrete cover for slab, column, beam and footing?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
explain five benefits of using standard terminology in the measurement process?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
How do you determine specific gravity of cement?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
may i know the detailed description of cutting length