Water absorption for stone and first class stone bricks?
Answers were Sorted based on User's Feedback
Answer / kumar
Absorption value of stone is less then .5% and for stone
bricks also same. Normal first class clay bricks water
absorption should not more than 20%. for Flyash bricks
water absorption is between 8 to 12%.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / ihtesham
GOOD QUALITY OF STONE CAN ABSORB WATER MAX UP T0 5% ONLY.
AND GOOD QUALITY OF BRICK CAN ABSORB WATER 15-20 %.By weight we can check.
| Is This Answer Correct ? | 1 Yes | 0 No |
How do you measure concrete?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
1.DIFFERENCE BETWEEN NOMINAL MIX AND DESIGN MIX? 2.WHAT IS MEANT BY STRUCTURAL DESIGN? 3.IN STAAD WHY WE RELEASE MOMENT TO A MEMBER? 4.ON WHAT BASIS PARTIAL FACTOR OF SAFETY ARE DECIDE?FROM THE LOAD COMBINATION? 5.WHY WE PROVIDE EXTRA BAR & DEVELOPEMENT LENGTH AT TOP? 6.FULL FORM OF SPT & SMB? 7.WHAT IS MEANT BY ITP IN A CONSTRUCTION PROJECT? 8.WHAT IS LEAST COUNT OF THEODOLITE SURVEY? 9.WHAT ARE THE CAUSES OF FAILURE OF FOUNDATIONS AND REMEDIAL MEASURES? 10.WHAT ARE THE VALUES OF COMPRESSIVE STRENGTH? 11.STEEL CALCULATION FOR FOOTING,BEAM & SLAB? 12.WHAT IS MEANT BY GANTRY GIRDER? 13.IN SITE HOW WE CAN IDENTIFY THE ONE WAY, TWO WAY SLAB? 14.DIFFERENCE BETWEEN ANCHORAGE LENGTH & DEVELOPEMENT LENGTH? 15.BEARING CAPACITY OF STEEL SHUTTERING?LOAD CARRYING FOR SHUTTERING?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
We use d*d/162 formula to get the weight value of steel per m, what is 162 in this formula?
extra how much quantity need to fill the actual excavated quantity.
why we are using stub column..? is it possible to construct steel stub column..?
what is difference between long column and short column?
16 Answers L&T, Tomi Polytechnic,
200mm*200mm thick block work 1sqm how many cement bags
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
What is approximate % of wastage considered for Marble and vitrified tiling works (flooring)?
What is the full form of APVC Pipe?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)