Water absorption for stone and first class stone bricks?
Answers were Sorted based on User's Feedback
Answer / kumar
Absorption value of stone is less then .5% and for stone
bricks also same. Normal first class clay bricks water
absorption should not more than 20%. for Flyash bricks
water absorption is between 8 to 12%.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / ihtesham
GOOD QUALITY OF STONE CAN ABSORB WATER MAX UP T0 5% ONLY.
AND GOOD QUALITY OF BRICK CAN ABSORB WATER 15-20 %.By weight we can check.
| Is This Answer Correct ? | 1 Yes | 0 No |
Why compressive strength of only concrete cubes and cylinders tested ? why not other shapes?
how much least count of levelling ?
in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
what is bulkage
How and where from do we get 162 for calculating sectional weight of TMT
How to layout the site plot ? Method with explation
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
0 Answers Tanishq, Target, Yahoo,
What are the alternate material for steel, Sand and aggregate
How can effect the Floor tiles if water absorption value is higher than 0.5%?
where are using of one way slab ?
Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)