Water absorption for stone and first class stone bricks?
Answer Posted / kumar
Absorption value of stone is less then .5% and for stone
bricks also same. Normal first class clay bricks water
absorption should not more than 20%. for Flyash bricks
water absorption is between 8 to 12%.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Which brick is best for construction ,either fly ash or AAC BLOCKS
What are the skills required to become an architect?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
What glue is least sticky?
Define What is passive earth pressure ?
What is portland cement
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
HOw much % of premium on DSR-2013 currently
What is Gsb tollens ?
what are the changes in concrete pour height as per IS 456, 2009?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
how much cement and sand required for 100sqm of wall plastering in different proportions
What was asked in isro civil interview