Answer Posted / balbhadrasinh
1 cement
2 sand
3 aggregate
4 water
Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
The foundations are placed below ground level, to increase?
What is componsation
What are the uses of groynes?
please briefly explain calculating or estimating steel quantity for a RCC column?
what does the track parameter mean in staad.pro?
how to take concrete quantity for precast segment for viaduct project?
undistributed samples are obtained by
what is the anchorage length of reinforcement.
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
States some of the tool bars used in cad?
Which ratio use for cement selery???
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Which Types Of Bricks ?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM