Explain creep?
No Answer is Posted For this Question
Be the First to Post Answer
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Why do we use stirrups in columns?
16 Answers Rishi Infra Projects,
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
1 cft of brickwork 1:6 mortar ratio need 12 numbers of bricks so find the quantity of sand and number of cement bags
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
Minimum no of bare in beam
how much the ratio of the m15, m25 .......etc
Why Vitrified tile are getting pop up.
List out the types of roofs?
Rust in Rod is harmful in structure because -––
is load combination is necessary in staad pro design
What is the minimum compressive strength of a brick according to IS codes ?
30 Answers Arup, CCCL, GMR, L&T, Rachana Sansad, Theme Engineering, WAPDA Water and Power Development Authority,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)