AS PER IS CODE FORMULA WAS Fck + 1.65 S
Fck - concrete grade
for M 20 ,M 25 grade s value 4
above M 25 s value was 5
| Is This Answer Correct ? | 24 Yes | 5 No |
Answer / mohsin khan
force = load/area
force is the pressure which comes after testing the cube in compressive strength machine and load is the the reading which we note and area is constant i.e 22.5 cm2
| Is This Answer Correct ? | 16 Yes | 2 No |
AS PER IS CODE FORMULA WAS Fck + 1.65 S
Fck - concrete grade
for M 20 ,M 25 grade s value 4
above M 25 s value was 5
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / m.koti, cosmicon group, vizag
force = load/area
force is the pressure which comes after testing the cube in
compressive strength machine and load is the the reading
which we note and area is constant i.e 22.5 mm2
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / swetha
COMPRESSIVE STRENGTH OF CONCRETE IS CALCULATED BY= LOAD AT FAILURE OF THE SPECIMEN/AREA OF SPECIMEN(ie 15cm*15cm=225cm)
| Is This Answer Correct ? | 1 Yes | 0 No |
after 28days curing compressive strength 100% achieved that means after 28 days 100% pressure can taken .so pressure=load/area.
load means reading of testing machine.
area =(150*150*150)=22.5 mm2 constant.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / done
Seriously I can't believe it. The formulas u r giving is for therotical value of compressive strength . u can calculate that value without making any cube. But for 28 day compressive strength there is machine which applies increasing load untill cube gets failed that load per unit area is nothing but compressive strength. Nowadays we don't have to wait for 28 days as these test are done after 2-3 days on labs n they put these result n their software which will ultimately give the final compressive strength
For more info what's app on 7249474640
| Is This Answer Correct ? | 0 Yes | 0 No |
how bitumen is prepared for NH,SH &other roads
What are the various load combination in Limit state method?
2 Answers Developer Building Contracting, DMRC, Engineers India Limited,
Respected sir i am appearing for the exam this year.I will be highly obliged if u kindly send me last year's interview paper on civil engineering in my email address debosmitroy@yahoo.in
what is the difference between tsp & tower
How to estimate quantity of paint in 1M3
what is procedure of ordinary pile foundation detial?
What is the wastage % of concrete in Conventional shuttering design & Mivan Shuttering for high rise building.
How to calculate the amount of Brick,cement & sand required for 1 cum of 230mm thick brick work with ratio 1:5 please give me an answer with detailed step
31 Answers Assurance, Design Ideas, Jeno Maran Builders, Lanco, NamPower, NCC, Prime Adhivas Contrats, Simplex, SSM, SSM Builders and Promoters,
what is the ratio of young's modulus of elasticity for a mild steel specimen in tension and compression?
What is gauge and gage
what is the different betweem expansion and construction joints
In two way slab where should we stop the work at end of the day?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)