What is the diff between cad & cadd?
No Answer is Posted For this Question
Be the First to Post Answer
I need model question papers for writing the Dubai municipality exam,for G+1
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
what is the curing time for plastring (all)?
what is floating slab foundation?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
How to calcuate the quantity of cement,sand for plastering 1:4 12mm thick?
explain water proofing in toilets and terrace
can i get placement in 2nd or 3rd year in college..
volume of 2 bulbs in pile of height 10' diameter 1'3''
what is the maximum percentage of crush sand in mix design.also what is the difference betweeen grite powder & crush sand.
2 Answers TATA, Vastu Kirti Enterprises,
how will i find leakage in underground?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)