How can I calculate the Compressive strength of cubes after 28
days of curing?Is there any formula or ration ?
Answer Posted / m.koti, cosmicon group, vizag
force = load/area
force is the pressure which comes after testing the cube in
compressive strength machine and load is the the reading
which we note and area is constant i.e 22.5 mm2
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What is horizon or horizontal mining?
at which depth the construction of tunnel is economical from cost and engineering aspect.
Explain what is progress payment?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
What is difference between limit state and working stress method? How it is applies in building structure.
Did any of the egyptian pyramids ever fall down?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
Exterior Joints,define
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
What is braced excavation all about?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?