How can I calculate the Compressive strength of cubes after 28
days of curing?Is there any formula or ration ?
Answer Posted / pintu kumar das
after 28days curing compressive strength 100% achieved that means after 28 days 100% pressure can taken .so pressure=load/area.
load means reading of testing machine.
area =(150*150*150)=22.5 mm2 constant.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Explain the design for rcc multi-storied building?
What is zoning permit?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
At what point does a circle start losing area when being flattened?
What is difference between limit state and working stress method? How it is applies in building structure.
pls give me ans to ACT formula cube testing porpuse
can i get hindi version of is codes based on civil engineering?
What will you do if you encounter problems like accidents?
1m square 20mm plastering how much of water need curing work
Under what circumstances should pot bearings be used instead of elastomeric bearings?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
what is m30 in concrete tiles
Volume of 25kg putty bag & 40 kg putty bag volume??