How to preparation billing for high rise building? anyhow
can give the tips
Answers were Sorted based on User's Feedback
Answer / sjtbehera
it is very easy. if you can calculate ground floor area,
you can calculate entire buildg.
Is This Answer Correct ? | 18 Yes | 2 No |
Answer / harikiran n gowda
Please refer IS 1200 or SP27 for estimation/billing purpose
Is This Answer Correct ? | 6 Yes | 1 No |
polavaram project is situated inwhich place?
How to calculate cut length of square shape stirrups?
what is meaning of AWS Welding procedure
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
If length is 20 m ,width is 20 m & thickness is 80 mm then how many brass it is?
What is The meaning Of Auto cad And Also Define What Is Drawing According To You
Explain why concrete barriers have curved surface profiles?
How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
how to calculate the length diamond shaped striupps in column
cement mortar 1:6 explain the cement and sand coefficient calculation?
In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete?
what is the bearing capacity of hard rock