Answer Posted / sjtbehera
it is very easy. if you can calculate ground floor area,
you can calculate entire buildg.
| Is This Answer Correct ? | 18 Yes | 2 No |
Post New Answer View All Answers
What is the difference between a wood shake and wood shingles?
What are the different theories of failure under static load?
why is M30 grade Concrete use for Foothing & Column M50
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
What is the exception critarea of cube?
Can we use concrete of slump cone in cube casting in which we have already measured slump?
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
115mm thickness brick work how to required mortar
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
What is the withdrawal force of steel nails?