How to preparation billing for high rise building? anyhow
can give the tips
Answer Posted / harikiran n gowda
Please refer IS 1200 or SP27 for estimation/billing purpose
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Advantage of Aluminum form work in terms of activities can be skip and cost too
what is the Asfalt test?in road constraction..?
what is escalation?how it is done?
In jack arch floor, the rise is kept?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What is alternate bid?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
what is the clear cover for shearwall?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
explain five benefits of using standard terminology in the measurement process?
Which IS Code/American Code applied for coupler test of steel
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
Prepare a Schedule for a Highrised building from starting stage to Handover?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level