Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


plc trouble shootings?

Answers were Sorted based on User's Feedback



plc trouble shootings? ..

Answer / raj anu raj

Every manufacturer issues catalogs, O&M manuals with their
products or download them from their respective site. Just
go through them. They will clearly explain you the error
codes which are visible(flashing leds) in the PLC. From
them trouble shooting will be easy.
Regards

Is This Answer Correct ?    14 Yes 1 No

plc trouble shootings? ..

Answer / ponnuswamy balakrishnan

It doesn't matter which brand of PLC you are hanldling
with. You should know the basics of electrical circuits and
able to read circuit drawings perfectly. PLC perform the
programme what we write for a specific objective.If it
ackowledges the inputs signals ( Sensors,switches etc)it
will automatically give o.k for output( motors and
temp.controllers etc.).So first check the input & output
signals in the plc for the broke down circuit. If it is
o.k.then proble should be in the hard wire line. May be the
wire groundeded or the defective component.

Is This Answer Correct ?    7 Yes 2 No

plc trouble shootings? ..

Answer / rajesh kumar rajesh

The programmable logic controller (PLC) is changing to
reflect the demands of sequencing and continuous processing
applications. The PLC can be thought of as a hardened
computer with high speed I/O and communications ports with
bus interfacing for multiprocessor or coprocessor
enhancements, and a BIOS that supports those features. PLC
manufacturers now retain control over both aspects of the
PLC which interoperate in a proprietary manner. Via the
delineation of the two may come a standard real time
operating system or real time kernel which would give rise
to true applications portability.
IF ANYONE NEED ANY MORE DETAILS PLEASE CONTACT ME :
rajeshbole@gmail.com or call me @ 09980499000(RAJESH)

Is This Answer Correct ?    8 Yes 7 No

Post New Answer

More Instrumentation Interview Questions

typical loop drawing of a simple feedback control comprising of one transmitter and one control

0 Answers  


How can we say that accuracy of measurement increases by using 3 or 4 wire RTD? because for example: If resistance of RTD element is say r ohms and Resistance of the cable from transmitter to RTD is R ohms And if 4 wire RTD is used, ____._____________________ R ohms | |_____._____________________ R ohms / \ / r ohms \ \ | |______.__________________ R Ohms | |_______._________________ R ohms Then the actual resistance measured will be: Total = r + R/2 + R/2 = r +R Ohms Note: r+R instead of r ohms. hence error

2 Answers  


why we are using pnp npn for sensors is there any other type?

1 Answers   CGL,


What is electronics?

6 Answers   ITC Infotech,


uses of profibus?

1 Answers  


plz exlain the dcs system of ABB sympony hamnony

1 Answers  


How can I map a tank?  Tank 15m h and 42m dia. we just fixed radar type lit. its reading shows over range. Now its required mapping ?

1 Answers   CMC,


what are the use of belew gear in general ??

0 Answers  


what is protonics how it is differ from electronics

1 Answers  


How to set up the various advanced process controllers, input the proper parameters, and tune those controllers given related control system information.

1 Answers   EID Parry,


what is Automation?

3 Answers  


i want the equation of this question. Tranmitter range is 120 mmwc and dcs flow range is 1700 nm3/hr. if i want to change dcs range from 1700 to 2400 nm3/hr then how much dp i have to enter in transmitter

2 Answers   GMR,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)