how to calculate steel in slabs ?
Answer / prashanth
First understand the span.
Thickness of the slab.
Normally per Sft 4 to 5 kgs of the steel will consume.
| Is This Answer Correct ? | 2 Yes | 7 No |
Describe why concrete must be compacted after it is poured?
Soil Mechanic: You are building a gravel road. How much water do you need to mix in compact 100 m3 of road quantity borrow pit gravel?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
What is chemical composion test
which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)
clear cover for concrete structures as per BS
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
What should be the 28 days cube strength for M-25 grade concrete?How it is connected with acceptance criteria of fck+3 as per IS 456-2000 and why?
4 Answers IVRCL, NCC, Simplex, Tata Steel Limited,
tensile strength of shuttering ply wood=?
Cement consumption of one cubic meter of aerocon blocks masonry?
0 Answers Sathiapal Engineers,
While casting slab at what length slab casting should be stop
How do we get this formula Ast=(0.5Fck/Fy) into(1-(in sqrt(1-((4.6Mu)/Fck.bd^2))into bd Fck=grade of cement i.e M25, M20 Fy=grade of steel i.e.Fe415,Fe250 Mu=moment b=width d=depth
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)