Answer Posted / anon
Workability is the ease with which concrete can be handled
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
What is the difference between linear dimension and aligned dimension?
What is semirigid connections?
construction workers how much time take one work or qty
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
what is meant by residual strain?
Why we provide hair pin for shed
Minimum and maximum size of the building components
pls give me some basic informations in construction of a structure?
How much is the cover for slab?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
When was the first motorway built in england?
How can we demolish concrete beams?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')