For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is
Answer / bugti.ghalib@yahoo.com
V=100*0.012 = 1.2 cum
in plaster volume increases by 33% then
dry volume = 1.2*1.33 = 1.596 cum
Cement = 1.596*(1/7)*1440 = 328.32 kg
hint: 1440 kg/m3 is the density of cement, 1 is the ratio of cement and 7 is the total sum of ratios
No. of bags = 328.32/50 = 6.56 bags ie.one bag of cement= 50 kg
sand = 1.596*(6/7)*35.28 = 48.26 cft ie. 35.28 = (3.28)3
| Is This Answer Correct ? | 3 Yes | 1 No |
How many bags required for 1cum grouting?
how many nos of National highway in India.
13 Answers HBC, L&T,
Pl. enlighten whether M20 grade RMC is suitable for columns & beams for 5 storied residential building
how much the volume of one packet cement ?
What is Refuse Area In High Rise Building ?
what do you know lean concrete
Hello sir,I am preparing for GET,Jindal steel & power limited.So can u plz send me few back papers including technical & aptitude.
The point of contraflexure occurs in
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing.
5 Answers Dee Vee Projects, L&T,
What is rolling stock
What is the actual formula to calculate dry consumption of 1cubic meter m20 Concrete???? Plzz tell seniors it is urgent..
Where hinge support is used in residential building?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)