For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is
Answer / bugti.ghalib@yahoo.com
V=100*0.012 = 1.2 cum
in plaster volume increases by 33% then
dry volume = 1.2*1.33 = 1.596 cum
Cement = 1.596*(1/7)*1440 = 328.32 kg
hint: 1440 kg/m3 is the density of cement, 1 is the ratio of cement and 7 is the total sum of ratios
No. of bags = 328.32/50 = 6.56 bags ie.one bag of cement= 50 kg
sand = 1.596*(6/7)*35.28 = 48.26 cft ie. 35.28 = (3.28)3
| Is This Answer Correct ? | 3 Yes | 1 No |
practically where this hinge and roller condition used
What is thumb rule in quality and quantity estimation of a Residential building??
0 Answers Ascent Constructions,
What is the Null Point of chimney in Power Plant
12. Have you ever been asked to leave a position?
What is Architect-Prepared Contract?
How to calculate the crank length of the rod in beam? Please give me a details.
1 cft concrete equal how many kgs
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
what is quantity of sand required to plaster wall about 1000 sq ft
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)