what is the percentage of binding wire required for 1 mt of
steel binding in gerally
Answer Posted / babu lal nayak
thumb rool is 3 kg. bracing wires requre for 100 kg. steel.....
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
What is aggregate?
How to build the floor to ceiling bookcase?
detailed calculation of the amount of cement used?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
How to do bbs in excel format
how do you stabilize a waterlogged area in road construction
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
Civil engineering material testing Standard results
What are the applications of the modulus of elasticity?
What are the benefits of rcc pipes over steel designed pipes?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
What is rate of concrete surface rendering work per sqm
important question on stones
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?