shuttering consumption per square feet in multi storeyed
building?
Answers were Sorted based on User's Feedback
Answer / mahesh mishra
Its not standardized but depends upon the architectural designs.
| Is This Answer Correct ? | 1 Yes | 1 No |
what is stressing
What is the difference between gray swr pipe & red swr pipe
what is quick sand
What is proportion of PCC Grade G?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
how can change 12mmdia@150c/c bar spacing to 16mmdia
how sir calculate the slab steel and sir i want to know that how i calculate shutter works payments in cum and the rate is 120 per cum
Whats the meanig of ,'K' VALUE in the case of soil.....
For Wet Mix Mecadam design what is Optimum moisture content
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
how we can calculate the quantity of sand & cement & also Aggregate so give me to this answer for a slab Length is : 25' /3.28 = 7.62 Mtr Width is : 30' /3.28 = 9.14 Mtr Depth is : 0.6"/3.28 = 0.15 2Mtr
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)