DEAR ALL
I HAVE AN OPURTUNITY IN WORK IN AFGANISTAN?
MY QUESTION IS
WHAT IS THEPRESENT SAFETY POSITION IN AFGAN?
HOW IS THE COMMUNICATION AND BANKING FACILITIES IN AFGAN?
HOW IS THE CLIMATE ABOUT AFGAN?
ANYBODY KNOW ABOUT THE ABOVE DETAIL PLS TO SENT THE ANSWER.
IF YOU ARE INTRESTED TO SENT THE ANSWER PERSONALLY PLS TO
CONTACT MY MAIL ALSO. @ santhoshselvamani@gmail.com

Answers were Sorted based on User's Feedback



DEAR ALL I HAVE AN OPURTUNITY IN WORK IN AFGANISTAN? MY QUESTION IS WHAT IS THEPRESENT SAFETY P..

Answer / scorpion

why are u suicide, if u want eat pizza u go US
if u want eat frise u go france, if u want eat open air u
go hills station, and if u want eat lat-muka pls come here.
and altimetaly u want eat bullet so, u are going
AFGHANISTAN. by the way it's just joking.

Is This Answer Correct ?    10 Yes 2 No

DEAR ALL I HAVE AN OPURTUNITY IN WORK IN AFGANISTAN? MY QUESTION IS WHAT IS THEPRESENT SAFETY P..

Answer / sjtbehera

this time it is very difficult to work. you may troble. the
war is going on.

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how tl calculate lap lengh of concrete in different grade of concrete.

3 Answers  


How to replace dia of bar in beam like 25mm 3no.S at bottom But due to some reason on site 25mm bar is not available Then is it ok to provide 20mm 4no.S? Give description or Formula to calculate area of steel and replacement?

3 Answers  


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

0 Answers  


what is meant by VDF FLOORING? why it is used?

3 Answers  


How many different between estimated quantity and practical work at site.

1 Answers  






what is the weight of 12 mm 40 mm aggregate?

2 Answers   SCON,


what qualifications did you need to become a civil engineer?

2 Answers   L&T,


what is the difference between sill beam,Tie beam and plinth beam?

2 Answers   L&T,


Management diagram of your project is–––

1 Answers  


What is the difference between face reinforcement and distribution bar in a concrete structure?

2 Answers  


how to carry out rate analysis for RCC work in column using M20 ?

1 Answers   Mazna Building Contracting,


how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

0 Answers   L&T, Voltas,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)