shuttering consumption per square feet in multi storeyed
building?
Answer Posted / mahi
7 sq.m / cum of conrete
Is This Answer Correct ? | 16 Yes | 3 No |
Post New Answer View All Answers
how many shuttering material required for 1000 sq.m built up area.
explain fie benefits of using standard terminology in the measurement process
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
Why should you show Client/Engineer activities clearly on the project plan?
For Wet Mix Mecadam design what is Optimum moisture content
what does the track parameter mean in staad.pro?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
in one SQM plaster how much Cement and sand consumed in ratio 1:4
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
What is the Maximum %age of Steel in columns and beams ?
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
Define block?
Explain what is the release of lien?