shuttering consumption per square feet in multi storeyed
building?
Answer Posted / divusp
6 times of concrete qty 1 cum= 6 sqm,
2.4 times of build up area 1000sqft=2400sqft shuttering.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
How can we demolish concrete beams?
Sir how to find cutting length for footing steel bars in the shape of "u"
What is the tallest man made structure in the world?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What is factor not to be taken in consideration in mix design?
how many tonnes equals to one cubic feet?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
How to do base isolation for RC framed structure using ETABS software?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
How many % we consider for lap for reinforcement for estimates
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.