1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM
WALL.
2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF
AREA 30 SQM
No Answer is Posted For this Question
Be the First to Post Answer
What is the diff between cad & cadd?
In barbending schedule why is o.42*D is taken. Means why o.42 only???
What is meant by autocad?
What height of a 3.5 m high 300 x300 mm proposed col. can be casted at a time ?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
What is labor and material payment bond?
why cutting length in design of beam is rounded more for -r/f & less for for +r/f
what is the dimensions of river sand truck trailer or trolly ?
how many days we should curing for plastering,brickwork,concrete?
10 Answers Al Faraa, Alfaraa, CCCL, Consolidated Construction Consortium Limited, Wipro,
Advantages and Disadvantages of using fly ash bricks over clay bricks?
11 Answers Pradhi Engineering,
what is the maximum number of course that can be laid according to IS code and the max height.
A person feels comfort when downs a stair because of ––
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)