In how many types u can do POP on ceiling and walls(on
which material or by using which material)? b) what is the
difference between dry , oil bound, enamel, acrlyic type of
painting?
2nd :- I have certain queries, please help to solve. a)
length of pile bore is 4m.excavation quantity will be area
* length where area will be pi/4 * dia*dia. Is this right?
b) It is a single reamed pile of 300m dia and reamed dia is
750mm. can any body help me to calculate excavated quantity
of this bulb(reamed section),, concrete quantity in bulb
with showing the formulas to be used?
No Answer is Posted For this Question
Be the First to Post Answer
for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how
what r remedies taken for foundation in black cotton soils..??
concrete coverings outside steel
13 Answers Jain Housing, L&T, Supertech,
what are the Task work of different labour.?
weight rcc m30
How find out Rolling margin of steel dia.wise?
WHAT IS NON DESTRUCTIVE TEST?PLEASE GIVE ME THE PROCEDURE?
what are the differences between Tie beam, Ground beam and strap beam. thanks
What is limit state method and working stress method and ultimate method
What is the thumb rule for calculating the number of chairs in slab?
explain the advantages of total stasion
Difference between pre-tensioning and post-tensioning.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)