Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


In how many types u can do POP on ceiling and walls(on
which material or by using which material)? b) what is the
difference between dry , oil bound, enamel, acrlyic type of
painting?
2nd :- I have certain queries, please help to solve. a)
length of pile bore is 4m.excavation quantity will be area
* length where area will be pi/4 * dia*dia. Is this right?
b) It is a single reamed pile of 300m dia and reamed dia is
750mm. can any body help me to calculate excavated quantity
of this bulb(reamed section),, concrete quantity in bulb
with showing the formulas to be used?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

Plz tell me...column and wall section drawing.

1 Answers  


WHY DO WE PROVIDE DEVELOPEMENT LENGTH AND EXTRA BARS AT TOP

2 Answers   Simplex,


why main steel is to be reinforced in shorter direction in case of slab?

11 Answers   CG, ESRT, Kirloskar, Lokmat, Priya,


How many material do I need to finish a 340sqms using 190 block size and 700mm x 450mm x 200 mm concrete including of outside and inside plastering

0 Answers   Home,


WHAT DO YOU MEAN BY MIX DESIGN OF CONCRETE?NAME THE VARIOUS METHODS OF CONCRETE MIX DESIGN.EXPLAIN I.S.METHOD OF MIX DESIGN

0 Answers  


what is preposition of M-5 grade

3 Answers   Montag Infrastructure,


What is the bearing capacity of black cotton soil, normal soil and rock?

2 Answers   Gammon, Mid India,


how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)

3 Answers  


concrete mix design for M 30 Grade

1 Answers  


Explain the various stages of the project planning process in construction?

0 Answers  


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

0 Answers  


what do you mean by ssd how it calculated

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)