give me an example of a time when you had to explain some new
procedures to your co-workers for quality service delivery,
how did you go about it?
No Answer is Posted For this Question
Be the First to Post Answer
what is the problem not getting 7 days slab cycle in Mivan formwork? what is the output of mivan carpenter per day?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
1 Answers ECR, RRB, Si Precision Moulds,
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Where do we use singly and doubly reinforced beam in construction purposes
2 Answers Isha Homes, Simplex, Sterling Wilson,
Can anybody please tell the procedure to calculate the quantity of admixture in Self Compacted COncrete??
What is the IS code for cube testing?
How much Strength of the cube can attain in 7days comparative 28 days strength?(as per IS code) ( specify the ref.clause also)
how can i test sand on field in lebortry?.
Manpower required for de shuttering of conccrete slab
what is constat for brickwork
How to check slab shuttering level.? Or check list for slab ?
the volume of 50kg bag is 27 lit 24.7 lit 44.7 lit 42.9 lit
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)