why did you choose this career
Answers were Sorted based on User's Feedback
Answer / amit kapri
because this is the career which can express my hidden
quilities infront of world.This is career which make me
exiceted. thanks
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / deepak kumar
because this is the career which can express my hidden
quailities and capacity to absorbed work pressure and given
max output under pressure
| Is This Answer Correct ? | 2 Yes | 0 No |
HOW TO DETERMINE FOUNDATION DEPTH OF A MULTYSTORIED BUILDING. IS THERE ANY OTHER FORMULA EXCEPT RANKINE'S MINIMUM DEPTH FORMULA.
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
Difference between ton and metric ton
what is the wet quantity of concrete?
How to calculate plastering for elevated water storage tank
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
Why did you choose to communicate with our organization ?
what is thumb rule exactly?
how should we take soil sample for CBR test?
what is meant by GANTRY GIRDER?
mix proportion of M20 AND what are different grades below it
6 Answers B L Kashyap, L&T, Panchshil Infrastructure,
What are the advantages of cad software’s?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)