Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What"s mean by term of BOQ in construction?

Answers were Sorted based on User's Feedback



What"s mean by term of BOQ in construction?..

Answer / jayavijayan k

BOQ means "Bill of Quantities".
Actually the BOQ is submitted by the Design Consultant to
the Contractor. Contractor has to quote the rates for each
items in the BOQ. Then finally the contractor who has
quoted the nominal rate will be selected for the particular
work.

Is This Answer Correct ?    214 Yes 7 No

What"s mean by term of BOQ in construction?..

Answer / sivakumar.r

BOQ means BILL OF QUANTITY

Is This Answer Correct ?    154 Yes 9 No

What"s mean by term of BOQ in construction?..

Answer / cnu.143

BOQ
Bill of quntity

Is This Answer Correct ?    48 Yes 8 No

What"s mean by term of BOQ in construction?..

Answer / punit

BOQ means Bill Of Quantities.

Is This Answer Correct ?    41 Yes 7 No

What"s mean by term of BOQ in construction?..

Answer / mohamed ibrahim

BOQ means bill of quantity..this is important to the
contracters...the work not mentioned in BOQ is done by the
contracter will not paid by the client any more..

Is This Answer Correct ?    47 Yes 16 No

What"s mean by term of BOQ in construction?..

Answer / seenu

BOQ Means BILL OF QUANTITIES

Is This Answer Correct ?    23 Yes 1 No

What"s mean by term of BOQ in construction?..

Answer / ashutosh aryan

A bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.

Is This Answer Correct ?    17 Yes 0 No

What"s mean by term of BOQ in construction?..

Answer / sayed obaidullah

BOQ means bill of quantities in this the rate will be mention by contractor and at the end of month will be send by construction manager and received by finance and finance will calculated that the project is made how much profit.

Is This Answer Correct ?    13 Yes 3 No

What"s mean by term of BOQ in construction?..

Answer / asanga

The Bills of Quantities will only be used for valuing monthly progress and variation

Is This Answer Correct ?    13 Yes 7 No

What"s mean by term of BOQ in construction?..

Answer / seeniraj

BOQ MEANS BILL OF QUANTITIES 

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

how to design an isolated footing having load and moment acting on the column also draw pressure diagram at the base

42 Answers   BARC, Fresher, Government, Idea, Technip,


how many stones require for rr masonery work 1cum.

3 Answers  


What is absolute coordinates?

0 Answers  


wat is the quntities of cement and sand for 10msquer wii plastering for 10mm tick

1 Answers  


For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is

1 Answers  


What is the use of extruded feature in solidsworks?

0 Answers  


Describe the various methods of concrete curing?

0 Answers  


how to calculate MR 9(derivation)

0 Answers   BARC,


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

0 Answers  


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

0 Answers   Mittal Steel,


why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure

0 Answers   C&W,


What should be the 28 days cube strength for M-25 grade concrete?How it is connected with acceptance criteria of fck+3 as per IS 456-2000 and why?

4 Answers   IVRCL, NCC, Simplex, Tata Steel Limited,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)