What"s mean by term of BOQ in construction?
Answers were Sorted based on User's Feedback
BOQ means "Bill of Quantities".
Actually the BOQ is submitted by the Design Consultant to
the Contractor. Contractor has to quote the rates for each
items in the BOQ. Then finally the contractor who has
quoted the nominal rate will be selected for the particular
work.
Is This Answer Correct ? | 214 Yes | 7 No |
Answer / mohamed ibrahim
BOQ means bill of quantity..this is important to the
contracters...the work not mentioned in BOQ is done by the
contracter will not paid by the client any more..
Is This Answer Correct ? | 47 Yes | 16 No |
Answer / ashutosh aryan
A bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.
Is This Answer Correct ? | 17 Yes | 0 No |
Answer / sayed obaidullah
BOQ means bill of quantities in this the rate will be mention by contractor and at the end of month will be send by construction manager and received by finance and finance will calculated that the project is made how much profit.
Is This Answer Correct ? | 13 Yes | 3 No |
Answer / asanga
The Bills of Quantities will only be used for valuing monthly progress and variation
Is This Answer Correct ? | 13 Yes | 7 No |
who much should be the lap length in reinfocement
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
can i get hindi version of is codes based on civil engineering?
0 Answers Cosmos, H Reck Engineers,
hai.... please any guide me were i can get interview questions& ans for Unigraphics
what are the natural dynamic pressures on a structure in coastal region like chennai, vizag etc,
hook and bend length in reinforcement?
How much material will consume for following specification water tank (9*7.5*6 feet)?
why we always consider Bulkage due to the voids only for the Fine aggregates not for the Coarse aggregates
What is the rate for RMC25 grade concreter in rs/cu mtr? What is the container capacity of RMC transporter in cu mtr?
2 Answers Akanksha, UltraTech,
How do you measure water flowing through 300mm diameter pipes?
what are RIB slabs explain about it
(Project Management Topic) What are the important criteria in the successful realization of the project?