What"s mean by term of BOQ in construction?
Answers were Sorted based on User's Feedback
BOQ means "Bill of Quantities".
Actually the BOQ is submitted by the Design Consultant to
the Contractor. Contractor has to quote the rates for each
items in the BOQ. Then finally the contractor who has
quoted the nominal rate will be selected for the particular
work.
| Is This Answer Correct ? | 214 Yes | 7 No |
Answer / mohamed ibrahim
BOQ means bill of quantity..this is important to the
contracters...the work not mentioned in BOQ is done by the
contracter will not paid by the client any more..
| Is This Answer Correct ? | 47 Yes | 16 No |
Answer / ashutosh aryan
A bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.
| Is This Answer Correct ? | 17 Yes | 0 No |
Answer / sayed obaidullah
BOQ means bill of quantities in this the rate will be mention by contractor and at the end of month will be send by construction manager and received by finance and finance will calculated that the project is made how much profit.
| Is This Answer Correct ? | 13 Yes | 3 No |
Answer / asanga
The Bills of Quantities will only be used for valuing monthly progress and variation
| Is This Answer Correct ? | 13 Yes | 7 No |
how to design an isolated footing having load and moment acting on the column also draw pressure diagram at the base
42 Answers BARC, Fresher, Government, Idea, Technip,
how many stones require for rr masonery work 1cum.
What is absolute coordinates?
wat is the quntities of cement and sand for 10msquer wii plastering for 10mm tick
For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is
What is the use of extruded feature in solidsworks?
Describe the various methods of concrete curing?
how to calculate MR 9(derivation)
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
What should be the 28 days cube strength for M-25 grade concrete?How it is connected with acceptance criteria of fck+3 as per IS 456-2000 and why?
4 Answers IVRCL, NCC, Simplex, Tata Steel Limited,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)