What"s mean by term of BOQ in construction?
Answers were Sorted based on User's Feedback
BOQ means "Bill of Quantities".
Actually the BOQ is submitted by the Design Consultant to
the Contractor. Contractor has to quote the rates for each
items in the BOQ. Then finally the contractor who has
quoted the nominal rate will be selected for the particular
work.
| Is This Answer Correct ? | 214 Yes | 7 No |
Answer / mohamed ibrahim
BOQ means bill of quantity..this is important to the
contracters...the work not mentioned in BOQ is done by the
contracter will not paid by the client any more..
| Is This Answer Correct ? | 47 Yes | 16 No |
Answer / ashutosh aryan
A bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.
| Is This Answer Correct ? | 17 Yes | 0 No |
Answer / sayed obaidullah
BOQ means bill of quantities in this the rate will be mention by contractor and at the end of month will be send by construction manager and received by finance and finance will calculated that the project is made how much profit.
| Is This Answer Correct ? | 13 Yes | 3 No |
Answer / asanga
The Bills of Quantities will only be used for valuing monthly progress and variation
| Is This Answer Correct ? | 13 Yes | 7 No |
how much shuttering oil required for 100 sqm shuttering?
1.WHERE THE SLAG CEMENT IS MAINLY USED. 2.FOR GOOD CONCRETE MIX OF M20 GRADE , CAN IT BE USED? 3. I WE USE FOR BRICKWORLiK AND PLASTERING ANY DISADVANTAGES?E
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What is absolute coordinates?
How many types bend used in civil reinforcing
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
how much quantity of cement and sand required for construction of 10 cum brick work( Brick size 3"*4"*9"(Standard size ) an d for 10 cum construction of SSM (Size stone masonary) with Cm 1:6 for both.
11 Answers GRC, KEC, L&T, Techno Electric and Engineering, UPENN,
How many nos. are Contains fly ash Brick in one Cubic meter ?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
at what height brick masonr, block masonry & Concrete wall can construct in a day ?
what is meant by shear center?????
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)