how i can calculate the actual nos & size of steel to make
1000sqft. x 3"thick slab
No Answer is Posted For this Question
Be the First to Post Answer
Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc
1cubic meter of bricks = ? kg
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??
3 Answers GKC Projects Limited GKCPL,
How is rate analysis prepared for M 25 grade of concrete?
in brick masonry,what are the types of bonds?where which type of bond is used?& why?Also what is header & closer?
In what construction is concrete grade m35 used?
4 Answers Cipla, High Concrete,
What is Time at Large?
What is Heavy Concrete & Normal Concrete
I had a plot of say 5000 sq.ft. and soil in the plot is normal soil. Now I had to work upon the tender quantities to prepare a preliminary budget within a day. Is there any thumb rule or assumptions to calculate the quantities which can differ upto 15% +/-?
What difference comes in constructing of house and a housing complex like society
advantage and dis adventagesof using crusher dust insted of sand in rcc works
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)