how to find out the quantity of cement sand and aggregate
in slab and flooring
at first volume i.e lenght ,breadth , hieght
den for eg.
a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3 or 1.52 m3 or1.55 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
Is This Answer Correct ? | 8 Yes | 4 No |
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab thickness or slab should be calculate in to in ?
what is difference of NP3 and NP4 pipe and what is the thickness of 1000mm dia NP4 pipe
Which foundation is stronger, Pile or Standard?
What is the difference between shuttering
the capacity of a storage resevoir can be decided by using
role of constituents of cement? how they works
3 Answers BPTP, Gammon, L&T, Totem Infrastructure, Vishwa Infrastructures,
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
how we can calaculate cutting lengh for stiruups 6mm dia . column size 20 cm x 30 cm, cover 20mm
What is meant by Rolling Margin? & which material will effect in this ?
what is irrigation
2 Answers Era Infra Engineering, Prothious,
Whats the difference between uniaxial column