Recently in an Interview I have faced a question that "In
SAP-SD, what is the Landscape of your project? Please help
me, thanks in advance.
Answers were Sorted based on User's Feedback
Answer / satyajit
The system environment on which we are working is called
landscape. In normal words, on which server you have worked.
Is it
1. Development
2. Quality Assurance or
3. Production
Is This Answer Correct ? | 9 Yes | 0 No |
Answer / ayan
GENERALY IN LAND SCAPE 3 SERVER PARTICIPATES
1.DEVELOPMENT SERVER - IT CONTAIN NORMALLY 3 CLINT
a)SAND BOX (WHERE WE R THE CONSULTANTS WORK)180
b)GILDEN MASTER (WHERE WE RE DO THE CONFIRURATION)100
c)USER TESTING (WHERE CONF.TESTED BY THE TEAM LAED)190
2.QUALITY SERVER - IT CONTAINS 2 CLINT
a)CONFIGURATION TESTING(HERE CORE TEAM MEMBER ALONG WITH
PROJECT MANAGER TEST THE CONFIGURATION)300
b)TRANING (710)
PRODUCTION SERVER IT CONTAIN
a)PRODUCTION 210(HERE LIVE DATA STORED)
WHAT EVER CONFIGURATION WE MADE TRANSFER THROUGH T CODE SE10
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / manoj kumar guin
Hi
Normally,landscape consist of 3 layer that are Dev,Qality,Production.
But i worked for one client which is having 4 layer that are Dev,Qality,pre-production & Production.
Thanks
Manoj kumar guin
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / krish
Landscape of the project will be 3 System or Multi System Landscape.
Is This Answer Correct ? | 0 Yes | 1 No |
Which tool used in SAP Implementation
Explain about Cash Sales & Rush Order Configuration and customization settings? I have been asked this question in a recent interview. Please answer to this question asap....
A is your client; b is your client’s customer. B need x material, but x material is now out of stock, then you can solve this problem?
what is line item
You want to list all condition records for a certain material or a certain sales organization. How would you do that?
What is the standard G/L A/c to be posted in ME21 during third party order processing?
What is Freezing stage in Business Blue print in asap methodology
In R/3,is it possible to substitute one product for another? If so, how it can be achieved?
how can configure credit limit on billing level in SAP SD
What are the basic types of information it (information structure) comprises of?
CAN WE DELETE THE CUSTOMER?IT IS POSSIBLE THANKS IN ADVANCE
what is the difference between the functional conslatant and technical consaltant in SAP. what are the duties of them.