what is the ratio of cement water and sand in RCC?
Answer Posted / csr
It depends on which grade we are using and it depends on
the required strength.
minimum we start from M15 1:2:4,
M20 1:1.5:3,
M25 1:1:2
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
how to check and keep control on the wastage of material at site
Discuss some applications of modular elasticity?
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
What things you need to take care of before building a kitchen island?
how much shouid be the rate for ready mix concrete per cubic meter
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
How long does it take concrete to harden?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
What is specific gravity???
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
what are the types of dimensioning?
How foundation is designed, Column design and beam design
what is cross hair cursor?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.